ALERT: Eastbound SR 520 between I-5 and Montlake Blvd. closed overnight Aug. 8

Learn more about major Portage Bay construction efforts

Montlake Blvd. closed between E. Hamlin St. and E. Louisa St. around-the-clock Aug. 21-24

Date: 8/21/2026 to 8/24/2026

Time: 10 p.m. Friday, Aug. 21, to 6 a.m. Monday, Aug. 24

Activity details:

Street and lane closureHigh-impact construction

Impact type:

Around-the-clockBike/pedestrianTrafficNoiseVibration

Crews will close Montlake Boulevard between East Hamlin Street and East Louisa Street, as well as some surrounding streets and ramps, including:

  • The Montlake Boulevard on-ramps to eastbound and westbound SR 520.
  • The eastbound SR 520 off-ramp to Montlake Boulevard.
  • A 300-foot-long section of East Roanoke Street west of Montlake Boulevard.
  • Lake Washington Boulevard between Montlake Boulevard and 24th Avenue East.

The westbound SR 520 off-ramp to northbound Montlake Boulevard will remain open. Crews will maintain a path for people walking, biking and rolling to cross SR 520 on Montlake Boulevard, with a limited detour south of SR 520.

Work during this closure

During the Aug. 21-24 weekend closure, crews will:

  • Install three new mast-arm sign structures (two northbound and one southbound)
  • Remove the large sign bridge spanning Montlake Boulevard just south of SR 520
  • Mount new signs on the mast-arm structures
  • Install a new southbound sign north of SR 520 that will be mounted on an existing utility pole

Looking for more information about the Montlake sign structure work? Visit our webpage here.

Contact Info

Email:  sr520bridge@wsdot.wa.gov 24-hour construction hotline: 206-319-4520